GKN Aerospace has received an order from the Swedish Defence Materiel Administration (FMV) to develop conceptual studies for advanced power and propulsion systems to support future fighter systems. The agreement runs for two years, from 2024 to 2025, with the potential for a follow-on phase beyond.